COMPLETION OF COMPLEX 3 PHASE EXPANSION

TEAM EXPERIENCE:

Paul Reeve was the PM and QS working with the Architects, ADP on the development works.

PROJECT:

The project was split into three phases. The first and second phases comprised of specialist performing arts facilities and learning spaces as well as academic offices for Theatres Studies, the CAPTIAL Centre and the Department of History of Art, as well as extensive laboratories, office and write up areas for Physics and Chemistry. The main Nuclear Magnetic Resonance, NMR, imaging laboratory was the largest in Europe on completion. The laboratory design had to factor in hazards in the form of very strong magnetic fields, exposed lasers, rapid Helium purging and Nitrogen leaks from research equipment. The two laboratories had very controlled condition requirements that involved the building of a specialist two storey plant extension.

The rehearsal studio rooms had tension wire platforms installed to enable theatre lighting and AV study as well as to make them suitable for performances.

Phase Three was the development at Millburn House , a new extension building. The two storey office section was designed on the basis of passive natural ventilation. The over hanging first floor and eaves shaded the office glazing. The set back at first floor enabled a two storey corridor space to act as a plenum for the return air and generate stack effect driven ventilation for the offices. The single sided office accommodation allowed the extension to be built around the new phase 2 plant room softening the impact of the otherwise plain elevation. In each office a louvred opening with insulated door that is user controllable enabled rapid ventilation even in black out conditions needed for film and tv review and research. The building also houses four seminar rooms and a tiered lecture room all connected to projection rooms.

OUTCOME:

The team offered the client a variety of VE options on the project.

Related case studies

Read similar case studies

Pebblebrook School - SEND 6th Form Block

Aylesbury

Invicta Primary School

Greenwich

University of Westminster - New Cavendish Street Campus

115 New Cavendish Street

University of Westminster - Harrow Campus

Watford Road

University of Westminster - New Cavendish Street Campus

London

Great Suffolk House

South Bank